Photovoltaic Plant “TUTLY” – 131.34 MW in Tutly, Uzbekistan (2021–2022)

  • Unloading and distribution of materials
  • Installation of fencing
  • Piling
  • Concrete foundations on piles
  • Central Substation – Auxiliary buildings, external concrete bases
  • Tracker assembly
  • Installation of photovoltaic modules
  • Scanning of photovoltaic modules
  • Installation of solar cables
  • Installation and connection of DC and AC power cables
  • Installation and connection of LV and MV cables
  • Installation of data cables
  • Connection of photovoltaic modules
  • Installation and connection of inverters
  • Positioning and connection of the Central Station and Substations
  • Installation and connection of auxiliary pillars
  • Installation and connection of LV equipment and weather station
  • Installation and connection of the grounding system
  • Labeling
  • Testing
  • Commissioning of the photovoltaic plant
uzbekistan-6
uzbekistan-1
uzbekistan-2
uzbekistan-3
uzbekistan-4
uzbekistan-5
uzbekistan-6
← back
  • Home
  • About Us
  • Services
  • Works
  • B.E.S.S. Works
  • Photovoltaic Works
  • Contacts
  • Privacy Police
  • Cookie Policy
  • Code of Ethics

Locations:

  • Terni (ITALY)
  • Athens (GREECE)
  • Nicosia (CIPRO)
  • EN
  • IT

Copyright 2025 KKM Photovoltaic S.R.L. ©  All rights reserved | VAT number: 01696440559

Powered by